TopBox Roof Entry - Freshly Completed and Waiting for Dispatch
- Hill Grwp
- Oct 7
- 1 min read
From Our Factory to the Skyline!
Another set of TopBox roof entries, freshly completed and waiting for dispatch.
Right now they’re standing ready on the factory floor — but soon they’ll be lifted into place on rooftops, providing safe, compliant entry and long-term protection for critical services.
Every TopBox we build is tailored to its site, meaning no two ever leave our factory quite the same.
This batch represents weeks of design, precision engineering, and quality checks — all before the first crane even arrives on site.

+44 1792899177 | information@hill-group.co.uk
Comments